6058 Miami St.
Hanahan, South Carolina
Developer/owner: Restoration Community Church, Hanahan
Architect(s): GJS Architecture, North Charleston
Project Manager: North Charleston
General contractor: Tupco Inc., Summerville
Engineer(s): Anchor Engineering, Hanahan (civil); ADC Engineering, Hanahan, (structural); David Hatcher, Hanahan (MEP)
Estimated completion date: October 2020
Estimated total cost of project:
$3.36 million
Project description: This 18,000-square-foot building will be the original campus, located on a 12.3-acre site. This pre-engineered metal building facility will have a 400-seat worship center, a 200-student children’s ministry center, an administrative center, and a large central foyer with cafe area